U 3 Class Submarine (1909)

From The Dreadnought Project
Revision as of 18:39, 6 April 2018 by FredBot (talk | contribs) (replace "[[Danzig Naval Dockyard" with "[[Kaiserliche Werft Danzig")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

The two 'U 3 Class Submarines were launched in 1909.

They were dubbed "Project 12".[1]

Overview of 2 vessels
Citations for this data available on individual ship pages
Name Builder Laid Down Launched Completed Fate
U 3 Kaiserliche Werft Danzig 27 Mar, 1909 Sunk 1 Dec, 1918
U 4 Kaiserliche Werft Danzig 18 May, 1909 Broken up 1919

History

Torpedoes

Guns

See Also

Footnotes

  1. Conway's All the World's Fighting Ships 1906–1921. p. 175.

Bibliography

  • Gray, Randal (editor) (1985). Conway's All the World's Fighting Ships 1906–1921. London: Conway Maritime Press. (on Amazon.com and Amazon.co.uk).


U 3 Class Submarine
  U 3 U 4  
<– S.M.S. U 2 Submarines (DE) U 5 Class –>