U.S.S. Saturn (1890)

From The Dreadnought Project
Revision as of 17:59, 22 July 2015 by Tone (talk | contribs) (Tone moved page U.S.S. Saturn (1898) to U.S.S. Saturn (1890) without leaving a redirect)
Jump to navigationJump to search
U.S.S. Saturn (1890)
Hull Number: AG-4
Builder: Harlan & Hollingsworth[1]
Purchased: 2 Apr, 1898[2]
Launched: 1890[3]
Commissioned: 11 Apr, 1898[4]
Decommissioned: 17 Mar, 1922[5]
Sold: 25 Sep, 1922[6]
Fate: Broken up

U.S.S. Saturn was a collier purchased by the U.S. Navy in 1898.

Construction

Service

Captains

Dates of appointment are provided when known.

Armament

1898

[10]

  • two 6-pounders

1918

[11]

  • one 6-inch/50 caliber
  • two 3-inch/50 caliber

See Also

Footnotes

  1. Silverstone. The New Navy. p. 131.
  2. Silverstone. The New Navy. p. 131.
  3. Silverstone. The New Navy. p. 131.
  4. Silverstone. The New Navy. p. 131.
  5. Silverstone. The New Navy. p. 131.
  6. Silverstone. The New Navy. p. 131.
  7. List and Station, July 1898. p. 6.
  8. List and Station, July 1898. p. 6.
  9. List and Station, July 1898. p. 6.
  10. Silverstone. The New Navy. p. 131.
  11. Silverstone. The New Navy. p. 131.

Bibliography

  • Silverstone, Paul H. (2006). The U.S. Navy Warship Series: The New Navy 1883-1922. New York: Routledge.