Capetown Class Cruiser (1918)
From The Dreadnought Project
Jump to navigationJump to search
The five light cruisers of the Capetown Class were completed between 1919 and 1922. They were follow-on units of the Ceres class, and generally completed after their design successors, the Danae class.
Fire Control
Rangefinders
Evershed Bearing Indicators
Gunnery Control
Control Positions
Control Groups
Directors
All ships were completed with gunnery directors in place.[1]
Torpedo Control
Transmitting Stations
Dreyer Table
Fire Control Instruments
[TO BE CONTINUED - TONE]
See Also
Footnotes
- ↑ The Technical History and Index: Fire Control in HM Ships, 1919, p. 11.
Bibliography
- Admiralty, Gunnery Branch (1910). Handbook for Fire Control Instruments, 1909. Copy No. 173 is Ja 345a at Admiralty Library, Portsmouth, United Kingdom.
- Template:BibUKDreyerTableHandbook1918
- Template:BibUKFireControlInHMShips1919